تأییدیه نهایی شرکت ره آوران آینده دریا در زمینه طراحی و ساخت سیستم های تصفیه آب توازن در اجلاس MEPC 79

Share on facebook
Facebook
Share on google
Google+
Share on twitter
Twitter
Share on linkedin
LinkedIn

Read our IMO Marine Environment Protection Committee (MEPC) 79 Brief below (click arrows to scroll or download directly after viewing full screen)
?
IMO MEPC held its 79th session December 12 – 16 and ABS just published an overview of significant issues discussed at this session that affects the #maritime industry.
?

BWM System Approvals

  • Final Approval was granted by the Committee for RADClean® BWMS, submitted by the Islamic Republic of Iran. RADClean® treats ballast water by filtration and electrochlorination during uptake and neutralization with sodium thiosulfate prior to discharge.
  • Final Approval was granted by the Committee for ECS-HYCHLORTMTM 2.0 System, submitted by the United Kingdom. The ECS-HYCHLORTM 2.0 System treats ballast water by electro-chlorination, followed by neutralization during discharge using sodium thiosulfate prior to discharge.
  • Basic Approval was not granted by the Committee for AirTree BWMS ABWOT, submitted by Germany. This system design treats ballast water with mechanical filtration at ballast water uptake, in-tank treatment by ozone during the voyage, and neutralization with sodium thiosulfate at discharge when needed.

Website Link

More to explorer

ABS MEPC 79 Brief

Read our IMO Marine Environment Protection Committee (MEPC) 79 Brief below (click arrows to scroll or download directly after viewing full screen)

Read More »

Leave a Reply

Your email address will not be published. Required fields are marked *